LogistiCenter at Monroe Crossing (Planned) 87 Monroe Crossing Cartersville, GA 30120
Property Information
Property Available: Yes
Incorporated: Yes
Property Type: Industrial
Industrial Park:
Incentivized Zones: Tier 3
Current Zoning: Industrial
Owner's Intended Zoning: Industrial
Rail: No
Size
Total Building Size: 308,880 SF
Maximum Available: 308,880 SF
Office Space: 3,215 SF
Site: 24.49 acres/9.91 hectares
Building Information
Ceiling Height (Feet): 36 - 36 ft./10.97 - 10.97 m
Construction Material: Tilt-Up
Year Built: 2024
Employee Parking Spaces: 146
Truck Parking Spaces: 74
Floor Thickness (inches): 7 in.
Column Spacing: 50' D x 54' W
Dock High Doors: 68
Drive-In Doors: 2
Fire Insurance Rating: Unknown
A/C in Production Area: Yes
Insulated: Yes
Sprinkler: Yes
Transportation, Distance to
Interstate 75: 1.6 miles/ 2.6 kilometers
Major Highway: 0.6 miles/ 1.0 kilometers
Port (Inland): 59.0 miles/ 95.0 kilometers
Port (Savannah): 289.0 miles/ 465.1 kilometers
Local Airport: 7.4 miles/ 11.9 kilometers
Commercial Airport: 47.9 miles/ 77.1 kilometers
Transload Facility: 35.3 miles/ 56.8 kilometers
Piggyback Facility: 27.8 miles/ 44.7 kilometers
Atlanta: 39.9 miles/ 64.2 kilometers
Chattanooga: 81.2 miles/ 130.7 miles/ 235.0 kilometers
Georgia Highlands College: 6.2 miles/ 10.0 kilometers
Chattahoochee Tech: 9.3 miles/ 15.0 kilometers
Community Information
Low Cost of Doing Business: About 7% Lower than the National Average.
Freeport Tax Exemption: Emerson - 100%
Energy Excise Sales Tax Exemption: Emerson - 4%
Millage Rate: 27.756
Workforce
Bartow's LDA labor force (based on place of residence and persons 16 years and older) is 850,905 as of August 2024, of those 31,424 are unemployed and actively seeking employment.